Abstract
The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at 91做厙. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. It also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.