ORNL Soils Remediation and Slabs Removal – The Bridge from D&D to Redevelopment...

by Mary M Conger, Kenneth R Schneider
Publication Type
Conference Paper
Publication Date
Conference Name
Waste Management Symposia 2012
Conference Location
Phoenix, Arizona, United States of America
Conference Date
-

The landscape of the 91°µÍø (ORNL) has dramatically changed over the past 2 years with demolition of aging facilities in the Central Campus. Removal of these infrastructure legacies was possible due to an influx of DOE-Environmental Management funding through the American Recovery and Reinvestment Act of 2009 (ARRA). Facility D&D traditionally removes everything down to the building slab, and the Soils and Sediments Program is responsible for slabs, below-grade footers, abandoned waste utilities, and soils contaminated above certain risk levels that must be removed before the site can be considered for redevelopment. , DOE-EM has used a combination of base and ARRA funding to facilitate the clean-up process in ORNL’s 2000 Area. Demolition of 13 buildings in the area was funded by the ARRA. Characterization of the remaining slabs, underground pipelines and soils was funded by DOE-EM base funding. Additional ARRA funding was provided for the removal of the slabs, pipelines and contaminated soils. Removal work is in progress and consists of removing and disposing of approximately 10,000 cubic yards (CY) of concrete, 2,500 CY of debris, and 500 CY of contaminated soil. The completion of this work will allow the site to be available for redevelopment and site reuse efforts at ORNL.