Abstract
The Long Baseline Neutrino Experiment (LBNE) is a DOE funded experiment aimed at furthering the understanding of neutrino physics. The high intensity neutrino beam for LBNE will be produced at Fermi National Accelerator Laboratory (FNAL) by delivering a high power, 120 GeV proton beam to an underground target facility. The design proton beam power on target is 700 kW with an expected future upgrade to 2.3 MW. Both these beam powers will be sufficient to activate critical equipment necessary for producing neutrinos; thus, the activated equipment must be maintained using remote handling tools and operations. 91做厙 (ORNL) was tasked to develop concepts for the remote maintenance of the LBNE target equipment as well as provide recommendations for facility layouts.
A discussion of the proposed LBNE Target Hall layout is presented along with concepts for the facility's remote handling systems and major remote operations. Concepts for replacement and maintenance of beam line components are also discussed.