Filter Results
Related Organization
- Biological and Environmental Systems Science Directorate (23)
- Computing and Computational Sciences Directorate (35)
- Energy Science and Technology Directorate
(217)
- Fusion and Fission Energy and Science Directorate (21)
- Information Technology Services Directorate (2)
- Isotope Science and Enrichment Directorate (6)
- National Security Sciences Directorate (17)
- Neutron Sciences Directorate (11)
- Physical Sciences Directorate (128)
- User Facilities (27)
Researcher
- Diana E Hun
- Philip Boudreaux
- Som Shrestha
- Tomonori Saito
- Bryan Maldonado Puente
- Mahabir Bhandari
- Nolan Hayes
- Venugopal K Varma
- Zoriana Demchuk
- Achutha Tamraparni
- Adam Aaron
- Alexander I Kolesnikov
- Alexei P Sokolov
- Bekki Mills
- Bruce Moyer
- Catalin Gainaru
- Charles D Ottinger
- Debjani Pal
- Gina Accawi
- Gurneesh Jatana
- Jeffrey Einkauf
- Jennifer M Pyles
- John Wenzel
- Justin Griswold
- Karen Cortes Guzman
- Keju An
- Kuma Sumathipala
- Kuntal De
- Laetitia H Delmau
- Luke Sadergaski
- Mark Loguillo
- Mark M Root
- Matthew B Stone
- Mengjia Tang
- Mike Zach
- Natasha Ghezawi
- Padhraic L Mulligan
- Peter Wang
- Sandra Davern
- Shannon M Mahurin
- Shiwanka Vidarshi Wanasinghe Wanasinghe Mudiyanselage
- Singanallur Venkatakrishnan
- Stephen M Killough
- Tao Hong
- Victor Fanelli
- Zhenglai Shen

Ruthenium is recovered from used nuclear fuel in an oxidizing environment by depositing the volatile RuO4 species onto a polymeric substrate.

We have been working to adapt background oriented schlieren (BOS) imaging to directly visualize building leakage, which is fast and easy.

Neutron scattering experiments cover a large temperature range in which experimenters want to test their samples.

The incorporation of low embodied carbon building materials in the enclosure is increasing the fuel load for fire, increasing the demand for fire/flame retardants.

Neutron beams are used around the world to study materials for various purposes.

The traditional window installation process involves many steps. These are becoming even more complex with newer construction requirements such as installation of windows over exterior continuous insulation walls.